SOLUTIONS
We develop innovative and high-tech measures, environmentally friendly and aimed at maximum customer satisfaction.
The lastest projects are the wind farm built near Taranto, between the towns of Faggiano and Lizzano.
The wind farm consists of 2 wind turbines each of 2MW power for a total installed capacity of 4MW.
It's estimated that the amount of energy produced:
- Will be equivalent to the energy needs of 2.500 standard
families; - Will be equivalent to 1.800 tons/year of oil;
- Will not be released onto the atmosphere 6.000 ton/year
of carbon dioxide.